Dirt
to done.
- 01Plan and stake out
The plan goes down on the lot first. Then stakes, string lines, and the dig with our own excavator.
- 02Pour
Footings and slab go in level and square, the base everything else rests on.
- 03Frame
Walls, plates, rafters and the ridge beam. The house takes its shape.
- 04Dry in
Sheathing and roof go on so weather stays out and the inside work can start.
- 05Lights on
Finishes, fixtures, final walkthrough, and the keys are yours.